Wooden door installation should be stuck for two time points

The production period of indoor wooden doors is longer, at least about 10 days, and the production cycle may be prolonged during the peak season of decoration. In addition, if the manufacturer of the wooden door is in the field, then also add the transport time. In this way, a wooden door can take about a month from purchase to measurement and installation. Therefore, professionals reminded the owners that in order not to affect the progress of the renovation, wooden doors should be ordered as soon as possible. The wooden door should be installed for two time points to avoid delays.

1, the measurement time <br> <br> doors belong to customized products, because the owners of the bedroom doors as well as its style, different color requirements, so after purchasing worker shall come to measure, and then the production by the manufacturer, and therefore the doors of measurement Accuracy is directly related to its post-installation effect. So, what time is the most suitable for the manufacturer's door-to-door survey? Simply put, it should be after the completion of bricklayer construction. At this time the doorway has been basically shaped, the kitchen (kitchen decoration renderings), bathroom (bathroom decoration renderings) of the tiles, the door has been pasted stone, the thickness of the wall is basically determined, this time the wooden door manufacturers come to measure the most accurate.

Before the measurement, if the original door hole is too wide, it can allow the bricklayer to build a new wall, or allow the woodworker to close the door hole with light steel keel + gypsum board; if the original door hole is too high, the lighter steel keel + plasterboard can be used to increase the height of the woodwork. The position of the exit is closed; if the original doorway has one side directly facing the wall and there is no threshold, then the bricklayer can build a threshold or let the woodworker make a threshold of 3-6cm.

2, installation time

The installation time of the wooden door is another more critical time node. The bad handling may cause trouble to the entire decoration process.

The process of installing the wooden door is relatively simple, and it will not perform dusty operations at the site. At most, it is the slotting or opening of the hardware. However, the wooden door itself is easily damaged. According to the principle of finished product protection, the installation time of the wooden door should be relatively late. It is better to perform the installation after the cabinet and the floor are installed. This is because if wooden doors are first installed before the cabinets are installed, it is easy to bump into the kitchen door when carrying the cabinet materials. The kitchen doors that many owners choose have glass, which increases the risk of damage to the wooden doors during the handling process.

Regarding the installation order of wooden doors and floors, there are different opinions in the industry. Some professionals believe that wooden doors should be installed first because floorboards are installed by flooring manufacturers. If the wooden doors are not installed, there is no way for flooring manufacturers to install skirting boards that join the doors and floors. As a result, the floor trader must wait for the owner to finish the door and run it again to install the baseboard. Other professionals believe that installing the floor first and then installing the door is also a good choice, because the installation of the floor has a large amount of work, and it takes dozens of boxes of floors to cover the entire room. If you install the floor afterwards, it is easy to bump the wooden door when moving the floor. In addition, electric drills, hammers, planers, chainsaws and other tools are used to install the floor. These things are very easy to damage the wooden doors. In fact, people are worried about the baseboard problem is very easy to solve, so that the workers who install the floor to keep more baseboard, and cut a good size to make a hole, so that the installation of wooden doors to install it on hand.

Kylin Chemicals manufactures and markets high quality chelants and sequestrants, including EDTA, Tetrasodium EDTA,EDTA Disodium salts, EDTA Tetrasodium salt, HEDP, PBTC, ATMP and DETPMP, etc.  

Ethylenediaminetetraacetic acid CAS 60-00-4 EDTA

Our sequestrants are widely used in variety of applications like detergents & cleaners, cosmetics, industrial water treatment, oilfield water treatment, textile dyeing, etc.

Phosphono Polycarboxylic Acid Belsperse 164

 

EDTA Chelants & Phosphonate Sequestrants

Edta Chelation,Phosphonate Sequestrants,Ethylenediaminetetraacetic Acid,Phosphino Polycarboxylic Acid

Kylin Chemicals Co., Ltd. , http://www.kylin-chemicals.com