The problems of low budget, missing items, stolen measuring units, grades of obscure materials, vague construction processes and other issues are the “trick” of the decoration team, especially the guerrillas. In this regard, industry experts proposed preventive measures to resolve disputes in decoration.

Comprehensive home improvement of the individual price

Case 1: Pull Down Single Item

Some owners know the unit price of tiles, but they do not understand the cost of labor and auxiliary materials for the tiles. The owners have cut the price of the tiles, but have suffered losses in labor costs and auxiliary materials.

Prevention methods:

Look at the decoration quotation, don't just look at the unit price of a certain project, you need to combine the costs of labor, auxiliary materials, and loss, and other items. If you find that a single item price is particularly low, you must pay attention to the price of other items.

Considering everything without missing items

Case 2: Missing items and main materials

Some decoration companies sometimes deliberately missed certain items on the decoration quotation, and some owners were attracted by the overall price of the quotation. Finally, during the decoration process, they constantly spent money for these missing items and fell into the agonies of desperation.

Prevention methods:

According to the design drawings, the owner should require the decoration company to clearly spell out all project main materials on the decoration contract, and indicate whether the purchaser is the decoration company or the owner himself. The main items that are often easily missed are materials used for corners such as walls and ceilings.

Calculated according to actual area

Case 3: Stealing Unit of Measure

The owner rarely notices the unit on the quotation, and not knowing that the different units mean that the quoted figures are highly skewed. For example, to customize a shoe, the size of the shoe should be marked in very detail, otherwise it will give poor decoration companies the opportunity to drill.

Prevention methods:

In many projects, it is recommended that the owners require the decoration company to calculate according to the actual area, such as wardrobes, shoe cabinets, etc., and use “items” as few as possible, so as to avoid errors in the decoration process.

Clear material grade specifications

Case 4: Levels and specifications of fuzzy materials

This is a common trick for bad decoration companies. For example, wood board, although the number and brand required, but did not indicate in the end what kind of quality, what grade, what specifications.

Prevention methods:

The decoration company is required to specify the parameters, such as the grade, specification, and model of the materials used, on the budget statement. The more details, the better, for reference in future installation and use.

Understand the various construction processes

Case 5: The construction process is ambiguous

Looking at the numbers and not reading the textual descriptions are the common mistakes that most owners make when they look at the quotation. They always feel that a digital error will cause losses, and the written explanations must not be used to doing things. This is not the case. Many construction projects can cause problems if they miss one process.

Prevention methods:

Learn more about some of the various construction technology standards for interior decoration, regularly go to the new house being renovated to understand the process, and finally ask the insiders to check.

The entrance decoration restaurant decoration decoration decoration company interior decoration decoration design home decoration decoration project budget table decoration look decoration company okay tile price tile background wall background wall tile tile specification

Acid Dyestuff

Acid Dyestuff,Acid Dyestuff Yellow,Violet Acid Dyestuff,Acid Dyestuff Blue

Organic Pigment,Inorganic Pigment Co., Ltd. , http://www.ziqi-glitter.com